Petroc College
Creating Better Facilities for Brighter Futures
The major refurbishment of 3 blocks at the centre of a live campus including:-
Block A - internal refurbishment and remodeling of teaching areas and break out spaces
Block C - Internal reconfiguration and refurbishment of the existing building, and external refurbishment including new windows and curtain walling, insulated external render, rainscreen aluminum cladding, trespa cladding and a curved brise soleil
Block D - Refurbishment to the roof of the existing sports hall, including new aluminum feature verge and eaves and the construction of a new vertical extension to create a new fitness suite.