A major refurbishment of the Mall and function of a new entrance to Green Lanes. This project included major demolition of the concrete frame and floor structure through a live shopping centre. A temporary entrance was constructed with a protected tunnel for the public
This restricted site on the High street,and within the centre was a logistical challenge, which with careful consideration and planning was successfully achieved