Dogs Trust

The Dogs Trust, Ilfracombe (phase 2)

This project involved the demolition and replacement of kennels and public facilities and also the refurbishment of existing buildings to provide an improved and more efficient design.

The main aim was to create a better environment for happier dogs and at the sane time reduce the carbon foot (paw) print and use renewable energy resources where possible, these building include high level insulation, underfloor heating in kennels , glass fronted and angled re-homing kennels and optimisation of natural light.